| Sign In | Join Free | My infospaceinc.com |
|
Model Number : Composite Floor Deck
MOQ : 1000 MT
Delivery Time : 10-30 Days
Customization : Customized to customer requirements
Application : Composite floor decking, bridge construction, slim floor system
Packaging Details : Sea Freight (Container/Bulk Vessel)
Payment Terms : L/C, D/A, D/P, T/T
Material : S350GD+Z275 galvanized steel
Logistics : Nestable profile, higher container loading
Certification : ISO 9001; CE Marking (EN 1090-1); BES 6001; EPD (ISO 14025 / EN 15804)
Brand Name : FASEC
Place of Origin : China
Price : USD 12-20/SQM
Surface Finish : Hot-dip galvanized
Supply Ability : 2,000 – 5,000 MT/month
Product Name : Composite Steel Floor Deck
Different from traditional floor decks laid on beam top flanges, ComFlor 210 sits on asymmetric beam bottom flanges, so the whole floor slab is wrapped within beam depth, bringing prominent economic gains:
It works perfectly for office, medical and educational projects that need to maximize usable area within height limits.
Designed for large bay construction with minimal temporary supports:
Built-in cross and longitudinal stiffeners strengthen bonding force between deck and concrete and raise slab rigidity. Three load grades (5.00 kN/m², 7.50 kN/m², 10.00 kN/m²) cover live loads, ceiling systems, finishes and partition loads for various scenarios.
| Attribute | Specification | Slimdek System Benefit |
|---|---|---|
| Beam Matching | Designed for asymmetric beams with widened bottom flange; deck mounted on bottom flange | Deck embedded in beam depth to realize ultra-thin slim floor |
| Profile Parameter | 210mm deep trapezoidal rib, dual-direction stiffeners, 600mm effective covering width | Optimized composite effect, saves concrete and steel materials |
| Span Capacity | 6.0m unpropped span; 9.0m propped span | Large open bays, reduces secondary beam arrangement |
| Fire Performance | 2-hour fire resistance without soffit fireproof coating | ASB beams offer 60-minute natural fire resistance, no extra fireproof materials needed |
| Pipeline Layout | Pipes arranged between ribs and beam openings | Free pipeline routing, saves dedicated service layer costs |
| Height Optimization | 400mm height reduction per floor vs traditional structures | Extra floor available for high-rise buildings or lower facade costs |
ComFlor 210 attains stable fire endurance without sprayed fireproof paint, reaching 2-hour fire rating to meet global commercial, medical and residential building codes. Single steel reinforcement inside each rib plus top anti-crack mesh ensures slab integrity under fire conditions. Anti-crack mesh accounts for 0.1% slab area complying with BS 5950 Part 4. ASB(FE) beams own natural 60-minute fire resistance protected by surrounding concrete; a 50mm notch shall be reserved on the deck top flange when matched with asymmetric beams.
The 210mm deep rib space is the prominent merit for intensive pipeline buildings:
It is the ideal choice for offices, hospitals and schools with complex electromechanical systems.
Full-cycle professional technical services are provided throughout project design and construction:
As an equivalent to ComFlor 210, this integrated slim floor composite deck is designed for multi‑story steel frame buildings, offering seamless compatibility with Slimdek® asymmetric beam systems. Mounted on beam bottom flanges, the deck is entirely embedded within beam depth, cutting per‑storey height by up to 400mm – enabling an extra floor for buildings over 10 storeys or drastically reducing exterior wall costs.
With 6m unpropped span, 9m propped span, 2‑hour natural soffit fire resistance and convenient integrated pipeline layout, the dual‑direction stiffener design ensures high composite efficiency and low material consumption. Backed by professional design software and complete technical standards, it delivers reliable performance and excellent cost‑effectiveness for structural engineers and contractors.
We, Hangzhou FAMOUS Steel Engineering Co., Ltd. (FASECbuildings), supply full support for your overseas multi‑story construction projects:
• Professional parameter verification
• Span calculation
• Slimdek system scheme design
• BIM resource provision
• One‑stop quotation & technical guidance
Please feel free to contact us to obtain complete technical documents and customized solutions.

|
|
ComFlor 210 Equivalent Deep Deck for Slimdek | Slim Floor, Integrated Beam Structure Images |