Sign In | Join Free | My infospaceinc.com
China Hangzhou FAMOUS Steel Engineering Company logo
Hangzhou FAMOUS Steel Engineering Company
USA-EUROPE Standard Engineering and Quality Control Build Our Brand Reliability! One Trial Order Bring Constant Cooperation!
Verified Supplier

5 Years

Home > Structural Steel Fabrication >

ComFlor 210 Equivalent Structural Steel Deck for Bridges & Infrastructure Projects

Hangzhou FAMOUS Steel Engineering Company
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

ComFlor 210 Equivalent Structural Steel Deck for Bridges & Infrastructure Projects

Delivery Time : 10-30 Days

Packaging Details : Sea Freight (Container/Bulk Vessel)

Customization : Customized to customer requirements

Model Number : Composite Floor Deck

Price : USD 15-20/SQM

Brand Name : FASEC

Supply Ability : 2,000 – 5,000 MT/month

Application : Road bridges, railway viaducts, pedestrian overpasses

Surface Finish : Hot-dip galvanized

Payment Terms : L/C, D/A, D/P, T/T

Certification : ISO 9001; CE (EN 1090-1); BES 6001; EPD

Place of Origin : China

MOQ : 1000 MT

Logistics : Nestable profile, higher container loading

Product Name : Composite Steel Floor Deck

Material : S350GD+Z275 galvanized steel

Contact Now

The ComFlor 210 Equivalent Structural Steel Deck is a professional composite deck tailored for bridge and infrastructure projects. Adopting a 210mm deep trapezoidal profile with cross and longitudinal stiffeners, it forms high-efficiency concrete composite slabs. Fabricated from Z275 high-strength galvanized steel, it withstands heavy traffic loads and harsh outdoor conditions, ideal for road bridges, railway viaducts and pedestrian overpasses.
Engineered for Bridge & Infrastructure Applications​

  • • Deep profile with cross stiffeners achieves high load capacity with less steel and concrete
  • • Supports mounting on top flange or extended lower flange of steel / concrete beams
  • • Excellent rigidity keeps low deflection under dynamic vehicle loads
  • • Adapts to highway, rail, pedestrian and other infrastructure structure forms
Long‑Span Capability for Infrastructure Efficiency​​

Unpropped spans up to 6.0 metres, propped spans over 8.5 metres. Longer clear spans reduce the quantity of supporting beams, cutting steel procurement, fabrication and erection costs while creating unobstructed under‑bridge space.
Specification​​
Parameter Details
Material & Coating High‑strength galvanized steel BS EN 10346 S280GD+Z275, Z275 coating 275g/m² both sides for outdoor anti‑corrosion
Profile Geometry 210mm deep trapezoidal with cross and longitudinal stiffeners; 600mm cover width; nestable for compact stacking
Thickness Standard 1.25mm high‑tensile steel; custom gauges available
Span Performance Unpropped up to 6.0 metres; propped over 8.5 metres
Fire Resistance Up to 2‑hour fire rating with unprotected soffit; 60‑min rating without extra fire protection
Composite Reinforcement Single bar per trough + anti‑crack mesh near slab top
Design Compliance Eurocode 4(EN 1994‑2), BS5950, AASHTO LRFD; supported by ComFlor®9.0.34 software
Superior Composite Action & Structural Strength​​

  • • Stiffeners realize effective load transfer between steel deck and concrete slab
  • • Trough reinforcement bars plus anti‑crack mesh deliver high composite slab strength
  • • Integrated structural unit copes with static and dynamic bridge traffic loads
  • • Good fatigue performance guarantees long‑term service for bridge decks
Reduced Concrete Usage – Infrastructure Efficiency​​
Reduces dead load for bridge substructure and foundation. A 270mm composite slab equals concrete consumption of a 115mm solid slab; a 350mm slab equals a 195mm solid slab. Lower material cost and smaller carbon footprint support sustainable infrastructure design.
Durable Galvanized Protection for Exposed Environments​​
Z275 hot‑dip galvanized coating resists moisture, de‑icing salt and atmospheric corrosion in open‑air infrastructure. No on‑site painting required, lowering whole‑life maintenance cost for bridge owners.
Fast Installation – Minimizing Infrastructure Disruption​​
Pre‑engineered sheets allow fast fixing on supporting beams and form immediate safe working platform for concrete pouring. Nestable design saves nearly 30% container space for export shipment. Shortens site construction time and reduces traffic disturbance for bridge projects with tight schedules.
Design Flexibility for Diverse Infrastructure Applications​​

Suitable for road highway bridges, railway viaducts, pedestrian footbridges, access platforms and conveyor bridge structures. Compatible with both integrated beam lower‑flange installation and conventional top‑flange installation.
Why Choose ComFlor 210 Equivalent for Bridges & Infrastructure?​​

The ComFlor 210 Equivalent integrates stiffener-reinforced structure, long-span performance, galvanized anti-corrosion protection, up to 2-hour fire resistance and outstanding material-saving benefits. Stable under heavy dynamic loads, it is highly suitable for global road, railway and pedestrian bridge & infrastructure projects.

Contact us for professional bridge-specific load calculation and customized design support. Our technical team delivers project-tailored solutions to meet your full infrastructure performance requirements.

Packaging & Shipping​​
Secure steel‑banded bundles; nestable profile saves ~30% container volume. Clear labels for traceability. Waterproof packaging for sea freight. Custom cutting per drawings reduces on‑site waste. Mainly loaded in 40ft containers or bulk shipment; custom packaging is acceptable.
After‑Sales Service​​

  • • Mill test certificates, datasheets and installation guides provided
  • • Design support: ComFlor software access, span‑load, fire‑design consultation
  • • On‑site installation guidance and troubleshooting
  • • Full material traceability & compliance documents for project approval
  • • 24/7 technical support during construction
Company Profile​​
Hangzhou FAMOUS Steel Engineering Co., Ltd. is a Chinese professional manufacturer supplying high‑grade composite floor decking for global construction and infrastructure sectors. Annual capacity reaches 15000 tonnes. Products comply with Eurocode 4(EN 1994‑2), BS5950, AS1397 and AASHTO LRFD. We handle bulk orders with stable quality and competitive price. Our products have been delivered to many overseas infrastructure projects, winning recognition for reliable quality and responsive service. We look forward to being your trusted partner.

ComFlor 210 Equivalent Structural Steel Deck for Bridges & Infrastructure Projects


Quality ComFlor 210 Equivalent Structural Steel Deck for Bridges & Infrastructure Projects for sale

ComFlor 210 Equivalent Structural Steel Deck for Bridges & Infrastructure Projects Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Hangzhou FAMOUS Steel Engineering Company
*Subject:
*Message:
Characters Remaining: (0/3000)